Filter by
Contracts (1082)
RSSLeak before break for Medzamor Nuclear Power Plant Unit 2, Armenia, Lot 1- Application of Leak Before Break (LBB) methodology to the primary system and surge lines
- Status
- Closed
Armenian Nuclear Power Plant, Medzamor-Armenia
- Status
- Closed
Delivery, testing, training for Armenian Nuclear Power Plant, Armenia of the following supplies : Lot 1(B3) - Reactor Neutron Flux SRM System instrumentation
- Status
- Closed
delivery, testing, training and related services for instrumentation and control basic engineering equipment for Armenian Nuclear Power Plant, Armenia - Lot 2:(B4) - Area Radiation Monitoring System.
- Status
- Closed
Instrumentation & Control Basic engineering and equipment procurement
Armenian Nuclear Power Plant, Medzamor-Armenia
- Status
- Closed
Improvement of Accident localisation Safety System (ALSS) for ANPP
Contract between Armenian Nuclear Power Plant and VNIIAES
- Status
- Closed
Programme: TACIS
EU Contribution: € 699,923.00
Benefitting zone: Armenia
- Status
- Closed
Programme: TACIS
EU Contribution: € 988,235.61
Benefitting zone: Armenia
- Status
- Closed
Programme: TACIS
EU Contribution: € 400,000.00
Benefitting zone: Armenia
- Status
- Closed
Programme: TACIS
EU Contribution: € 4,075,102.07
Benefitting zone: Armenia
- Status
- Closed