- Status
- Closed
Details
- Type of activity
Design Safety
- Nature
Services
- Contracting authority
European Commission
- Method of Procurement
(FR2007) Restricted Call for Tender - External Actions
- Duration
15/07/1993 - 15/07/1994
- Partner
Rosenergoatom
- Contractor
ANSALDO AZIENDA DI FINMECCANICA SPA
- Project / Budget year
WW9103 Energy / 1991
Objectives
Task 1:
Establish a clear basis for a seismic design review.
Task 2:
Determine the appropriate safe shutdown earthquake level requirement for the Novovoronezh plant after a careful review of current standards and regulatory requirements in both the CIS and the West.
Task 3:
Obtain data for local ground response and soil-structure analysis to be carried out in a possible next phase of a TACIS project.
Results
Task 1:
According to the objective, a quality assured basis for seismic design review was created.
Task 2:
The safe shut down earthquake level was calculated.
Task 3:
The achievement was according to the objective above.
The project partners agreed on the following values based on the calculation outcome:
SL I: 5 degree MSKS;
SL-2: horizontal PGA = 0,11g; vertical PGA = 0,05g.