R1.09/95 Improvements of Physical protection

Status
  • Closed
All Countries
Benefitting Zone
Worldwide
€ 283,639.04
EU Contribution
Contracted in 1996
TACIS
Programme
Technical Assistance to the Commonwealth of Independent States

Details

Type of activity

On Site Assistance

Nature

Services

Contracting authority

European Commission

Method of Procurement

Direct Agreement & AV DA

Duration

01/03/1997 - 01/12/1998

Contractor

BELGATOM SA

Project / Budget year

WW9508 Nuclear Safety 1995 / 1995

Objectives

The present project was to produce the specific design of the physical protection system (PPS) on Kola, Novovoronezh, Kalinin, Kursk and Beloyarsk NPPs based on the general concept already performed.

The project was subdivided into the following tasks:

  1. Management of the project; QA plan.
  2. The set-up of the data packages (for NPPs concerned). Several missions are performed along the project.
  3. Study of PPS related to a specific NPP. The study includes the validation of functional analyses issued from the previous definition studies from SNPP and BNPP, the basic design and the technical specifications.
  4. The contractor will supply detailed cost estimates for each PPS concerning on-site systems implementation.

Those figures must be detailed according to three scenarios of implementation:

  • Priority urgency no.1 relevant to minimum required security level;
  • Medium level implementation of systems;
  • Optimum implementation of systems.

Results

The project’s contract expired on 1.12.1998 without achieving the objective.