- Status
- Closed
Details
- Type of activity
Design Safety
- Nature
Services
- Contracting authority
European Commission
- Method of Procurement
(FR2007) Restricted Call for Tender - External Actions
- Duration
05/03/1999 - 05/03/2000
- Contractor
EWN ENTSORGUNGSWERK FUER NUKLEARANLAGEN GMBH
- Project / Budget year
WW9608 Nuclear Safety 1996 / 1996
Objectives
The present project was proposed as a result of the Brainstorming meeting held at Garching (Germany) February 2 and 3, 1995 and in full consideration of the safety relevance of the RPV integrity issue.
The main activities to be addressed in this project are:
Definition of the most urgent problems which could be solved by investigating Greifswald samples in addition to plant specific studies carried out so far;
Detailed elaboration of the procedures for cutting the samples;
Definition of geometry, size and position where to cut the samples, including samples from reactor pressure vessel internals;
Preparation of the licensing procedure for samples taking;
Development of a procedure for documentation and handling of samples;
Documentation of the results of former studies on the Greifswald reactors which were exclusively based on small-sized specimens;
Documentation of the operational history of the different reactors, including estimation of fluences of RPVs and internals.